Bait and Switch


  1. MJ

    Agreed completely! I did this once, only my boss at the time took all the measurements himself and hard lined the floor plan. What was supposed to be scanning the hard lined drawings in, putting them on a title block, and adding a few notes, turned into massive changes to his drawings. Only he didn’t want me to CAD them up, or revise the hand drawing, so I had to make changes in Photoshop. I wish I was lying…